bg



SARCOPHAGUS on the way to GWANGJU

This was millimeter precision work on all fronts.


 Permalink

MISSION ETERNITY at the ARS ELECTRONICA 2009

watch more of the great pictures: thanks to that last minute effort monorom and silvan especially,
who had to wait hours longer to get packed and ready! THANKS Tabea
watch more

 Permalink

router sweltering under Bolzano sky

Because we "only" have a Wifi connection to TANK-8 in Bolzano, we put a router serving as client on top of the TANK to ensure a somewhat reliable connection to the factory building containing the actual access point. Cargo containers tend to be very good shields, so having a Wifi-client in direct line of sight was necessary.

This is what the device looks like after 2 weeks of an average temperature of 33 centigrade during daytime:



How to resist the power of the sun? Hm. Anyone any ideas?
Comments (3)  Permalink

Mix some kilowatts with tons of steel and heavy labour

Posted some digital shots of the binz construction site into the gallery.

More photos to come as soon as the films are processed and scanned...

 Permalink

etoy scheduled at Tweakfest

The MISSION ETERNITY SARCOPHAGUS is scheduled to appear at the Tweakfest.
Stimulating Zurich's creative industry and networks, the Tweakfest is
"the first platform to combine culture, research, communication, and entertainment. Tweakfest offers creative spirits, researchers and managers a forum in which to debate, make presentations and unveil latest products and services."

Visit us on May 24-26 at Turbinenplatz in Zurich!

Comments (1)  Permalink

another etoy.TANK hits the transportation net

dear etoy.INVESTORS & AGENTS,

etoy.MANAGEMENT is proud to announce that another 40 ' High Cube Container was sent off to the etoy.UNIVERSE today. the TANK will be modified and later serves as MISSION ETERNITY SEED ENCAPSULATION TANK in Voelklingen near Saarbruecken. the plan is to inject 5000 to 7500 children into a MISSION ETERNITY SCREENING GRID between May 2007 and April 2008.

modification starts next friday and will be finished on the 2nd of May 2007. a team of two etoy.AGENTS will oversee welding, insulation and wood works within the next few weeks. another 4 etoy.AGENTS install children processing hardware and software in late april 2007.



www.missioneternity.org IS CROSSING THE DEADLINE.






GERSCSSAL schrieb:
Der von Ihnen bestellte 40' HC Container wird am Freitag, den 09.03.2007 um 10.00 Uhr
Bei folgender Adresse eintreffen:

Anlieferadresse:

Weltkulturerbe Völklinger Hütte
Europäisches Zentrum für Kunst und Industriekultur
66302 Völklingen

Bitte halten Sie eine Abkranmöglichkeit zu diesem Zeitpunkt bereit.
Mit freundlichen Grüßen

Christian Muths
Sales
Star Container Services GmbH
Bremerhaven - Germany
http://www.starcontainer.de
 Permalink

MISSION ETERNITY Tank on the way to san jose

This was the first time in etoy.HISTORY, that all tanks assembled in the same place.



for more pictures visite the gallery
Thanks to Dominique Batschlet for the images.
Comments (1)  Permalink

M221E sacophagus construction vid

Some mobile footage by Styro. Shot in the last night before shipping the tank.
Comments (2)  Permalink

Pixel- und Verteilermodul Anordnung

Comments (4)  Permalink

sarcophagus

AT LEAST MISS MONOROM IS BLINKING!
BLINK ! BLINK ! BLINK !

the art is great but the circumstances under which we currently work are fucked up! media art festivals really have a problem... isea for instance burns all the resources for the non-art part. sure... there are many reasons for this... but to burn 100% for organizational aspects and 0% for art production is wrong.
 


hopefully monoroms smile and all our passion helps us to survive the crisis we are facing.

btw pol said: die aussprache von sarcophagus im englischen hat ein _kurzes_ "pha" ;-) so ungefaehr: ~sarkoffegus~.

 Permalink
Next1-10/18
etoy.com twisting values since 1994